Finally got a chance to glass the top this arve. Been no wind at all for over a week
unless you have an 18m foil kite and even then, one of those guys got to swim in.
Top glass schedule:
2 x 6 onz and a small patch of 4onz over the strut attachment points. Was going to go a full extra layer of 4 onz but decided not to bother.
The 2 layers of 6 onz wrap down the rails. From memory, there is a 4onz and a 6 onz under the wood so it should be strong enough.
A few pics:
The wood looks nice once the resin gets on it.
- IMG_1140.JPG (118.79 KiB) Viewed 2323 times
A close up of the front strap inserts.
- IMG_1141.JPG (166.41 KiB) Viewed 2323 times
And one of the rear end.
- IMG_1145.JPG (135.84 KiB) Viewed 2323 times